Project & Facility Information
Basic project identification for the authorization header.
Chemicals Being Introduced
List each PSM-covered chemical. Include the OSHA TQ for reference — helps confirm applicability at startup.
Chemical Name
Max Inventory
OSHA TQ (lbs)
PSSR Verification — 29 CFR 1910.119(i)
Check each item to confirm it has been completed and verified prior to authorization. Each item maps to a 29 CFR 1910.119(i)(2) requirement.
Conditional Items & Open Actions
Document any items conditionally accepted as open at the time of authorization. Each must have a formal risk acceptance, responsible owner, and completion commitment date.
Authorizing Signatories
We recommend the authorization be signed by the plant manager or equivalent site authority (a good practice, not a specific OSHA signature requirement). Additional signatures provide defense-in-depth documentation.
Additional Notes (Optional)