Project & Facility Information
Basic project identification for the authorization header.
Chemicals Being Introduced
List each PSM-covered chemical. Include the OSHA TQ for reference — helps confirm applicability at startup.
Chemical Name
Max Inventory
OSHA TQ (lbs)
PSSR Verification — 29 CFR 1910.119(i)
Check each item to confirm it has been completed and verified prior to authorization. All five items are regulatory requirements.
Conditional Items & Open Actions
Document any items conditionally accepted as open at the time of authorization. Each must have a formal risk acceptance, responsible owner, and completion commitment date.
Authorizing Signatories
The authorization must be signed by the plant manager or equivalent site authority. Additional signatures provide defense-in-depth documentation.
Additional Notes (Optional)