FMEA
Worksheet Tool

Failure Mode and Effects Analysis — identify, rank, and prioritize failure risks before they become incidents. Classic RPN scoring plus AIAG-VDA Action Priority, fully in-browser, print-ready.

Classic RPN  S×O×D AIAG-VDA Action Priority Sort by Risk Filter by Severity Band Revised RPN Tracking Print-Ready Output
📄 FMEA Document Header
#
Item / Component
Function
Failure Mode
Effect(s) of Failure SEVERITY Cause(s) of Failure OCCURRENCE Current Detection Controls DETECTION RPN AP Recommended Action(s) Responsibility & Target Date Actions Taken REVISED SCORES
S
O
D
RPN
AP
S O RPN
Total items 0
0 High risk
0 Medium
0 Low
Avg RPN
Max RPN
View RPN
RPN ≤100 ≤200 >200
Click any cell to edit. Tab to move between cells.
Severity (S) Rating Scale
SDescriptionEffect
10Hazardous — no warningAffects safe operation; failure without warning
9Hazardous — with warningAffects safe operation; failure with warning
8Very HighSystem inoperable; major disruption
7HighSystem operable but significantly reduced
6ModerateSystem operable; some performance loss
5LowSystem operable; minor performance loss
4Very LowMinor defect; most customers notice
3MinorMinor defect; some customers notice
2Very MinorMinor defect; discriminating customers notice
1NoneNo discernible effect on operation or safety
Occurrence (O) Rating Scale
ODescriptionApprox. Rate
10Very High — almost certain>1 in 2
9Very High1 in 3
8High — repeated failures1 in 8
7High1 in 20
6Moderate — occasional1 in 80
5Moderate1 in 400
4Moderate — infrequent1 in 2,000
3Low — relatively few1 in 15,000
2Low1 in 150,000
1Remote — failure unlikely<1 in 1,500,000
Detection (D) & Action Priority
DDescription
10Absolutely impossible to detect
9Very remote chance of detection
8Remote — detection very unlikely
7Very Low detection likelihood
6Low detection likelihood
5Moderate detection likelihood
4Moderately High — likely detected
3High — very likely detected
2Very High — almost always detected
1Almost certain detection — reliable control
AIAG-VDA Action Priority (AP)
AP is determined by Severity band, Occurrence, and Detection together. This tool uses a simplified AP lookup consistent with AIAG-VDA 2019 guidance.
HHigh — Immediate action required. Must reduce risk.
MMedium — Action recommended. Team to decide.
LLow — At team's discretion. Document rationale.